🧠 Test Your Knowledge!
Multipurpose Dam Projects » Dam Site Selection Criteria
What you'll learn this session
Study time: 30 minutes
- The key criteria for selecting appropriate dam sites
- Physical factors that influence dam location (geology, topography, hydrology)
- Environmental considerations in dam site selection
- Social and economic factors in dam site assessment
- Case studies of successful and problematic dam site selections
- How to evaluate potential dam sites using multiple criteria
Introduction to Dam Site Selection
Building a multipurpose dam is one of the biggest engineering projects a country can undertake. These massive structures can provide electricity, water for irrigation, flood control and recreational opportunities. But before a single brick is laid, engineers and environmental scientists must carefully select the right location. Poor site selection can lead to disasters, environmental damage and wasted resources.
Key Definitions:
- Multipurpose dam: A large barrier that holds back water for multiple uses including hydroelectric power, irrigation, flood control and water supply.
- Catchment area: The area of land that collects and drains rainwater into a river system.
- Bedrock: The solid rock beneath soil and loose surface materials that forms the foundation for a dam.
- Reservoir: The artificial lake created behind a dam.
🏠 Why Dam Site Selection Matters
Choosing the right location for a dam is crucial because:
- It determines the dam's safety and longevity
- It affects construction costs and economic viability
- It influences environmental impacts upstream and downstream
- It determines how many people might need to be relocated
- It affects the dam's ability to serve its intended purposes
📝 The Selection Process
Dam site selection typically involves:
- Initial desktop studies using maps and satellite imagery
- Field investigations of potential sites
- Geological and hydrological surveys
- Environmental impact assessments
- Social and economic feasibility studies
- Consultation with affected communities
Physical Factors in Dam Site Selection
The natural landscape provides both opportunities and constraints for dam construction. Engineers must work with these physical factors to find the optimal location.
Geological Considerations
The underlying rock structure is perhaps the most critical factor in dam site selection. The bedrock must be strong enough to support the enormous weight of the dam and the water it will hold back.
👍 Ideal Geology
Solid, non-porous rock like granite or basalt makes an excellent foundation. These rocks don't allow water to seep through and are resistant to erosion.
⚠ Problematic Geology
Limestone can dissolve in water, creating caves and sinkholes. Fault lines can shift during earthquakes. Porous rock allows water to leak through the dam foundation.
🔬 Testing Methods
Engineers drill core samples to test rock strength. They use seismic surveys to detect faults and weak zones. Permeability tests measure how easily water moves through rock.
Topographical Factors
The shape of the land determines how much water a dam can store and how efficiently it can be built.
🗺 Valley Shape
Narrow valleys with steep sides are ideal for dams because:
- They require less construction material
- They create deeper reservoirs that store more water
- They have a smaller surface area, reducing evaporation
Wide, flat valleys are less suitable as they require longer dams and create shallow reservoirs.
🌍 Reservoir Capacity
The volume of water a dam can store depends on the topography upstream. Engineers look for:
- Wide basins upstream that can hold large volumes of water
- Natural bottlenecks where a relatively small dam can block a large valley
- Areas where the reservoir won't extend into neighbouring countries or protected areas
Hydrological Factors
Understanding water flow patterns is essential for dam planning. Engineers must consider both normal conditions and extreme events.
- River flow: Consistent year-round flow is ideal for hydropower generation.
- Catchment area: Larger catchments typically provide more reliable water supply.
- Flood patterns: The dam must be designed to handle the largest possible floods.
- Sediment load: Rivers carrying high sediment loads can quickly fill up reservoirs.
- Rainfall patterns: Climate change may alter historical rainfall patterns.
Environmental Considerations
Dams significantly alter river ecosystems and surrounding landscapes. Modern dam planning must carefully assess these impacts.
🌿 Biodiversity Impacts
Dam sites should ideally avoid:
- Areas with rare or endangered species
- Important wildlife corridors
- Unique habitats that can't be recreated elsewhere
- Rivers with migratory fish species
Environmental impact assessments identify these sensitive areas before site selection.
💧 Water Quality Concerns
Reservoirs can affect water quality in several ways:
- Decomposing vegetation in new reservoirs releases methane
- Deep reservoirs can stratify, with oxygen-poor water at the bottom
- Water temperature changes can affect downstream ecosystems
- Sediment trapped behind dams doesn't reach downstream areas
Social and Economic Factors
Beyond the physical environment, dam planners must consider human communities and economic realities.
Population Displacement
One of the most controversial aspects of dam construction is the need to relocate people living in areas that will be flooded. Ideal dam sites minimize this displacement or ensure fair compensation and new opportunities for affected communities.
- Sites in sparsely populated areas are preferred
- Cultural heritage sites should be avoided or preserved
- Indigenous communities' rights must be respected
- Resettlement plans must provide adequate housing and livelihoods
Economic Viability
Dam projects require enormous investment. Site selection must consider:
- Construction costs: Affected by site accessibility, local materials and geological conditions
- Benefit-to-cost ratio: Will the dam's benefits justify its expense?
- Proximity to users: Dams far from population centres or farmland may be less economical
- Alternative options: Would smaller dams or different water management approaches be more cost-effective?
Case Study: Aswan High Dam, Egypt
The Aswan High Dam on the Nile River demonstrates both successful and problematic aspects of dam site selection:
- Geological success: Built on solid granite bedrock, providing excellent stability
- Hydrological success: Controls the Nile's annual floods, preventing both flooding and drought
- Social impact: Required relocation of 90,000 people and submerged ancient Nubian archaeological sites
- Environmental consequences: Trapped nutrient-rich sediment that previously fertilized farmland in the Nile Delta
- Economic benefit: Provides about 10% of Egypt's electricity and expanded irrigated agriculture
This case shows how even well-selected dam sites involve trade-offs between different factors.
Balancing Multiple Criteria
The perfect dam site rarely exists. Instead, planners must weigh different factors against each other to find the best compromise.
Decision-Making Frameworks
Modern dam site selection often uses multi-criteria analysis that considers:
- Technical feasibility (geology, topography, hydrology)
- Environmental impacts and mitigation possibilities
- Social consequences and community acceptance
- Economic costs and benefits
- Political and legal constraints
Each potential site receives scores across these categories, helping planners make informed decisions.
The Future of Dam Site Selection
As climate change alters rainfall patterns and river flows, dam site selection faces new challenges:
- Historical flow data may no longer predict future conditions
- Extreme weather events may become more frequent
- Water scarcity may increase competition for resources
- Environmental concerns are receiving greater attention
Modern dam planning increasingly considers these uncertainties and incorporates more flexible designs that can adapt to changing conditions.
Summary: Key Site Selection Criteria
When evaluating potential dam sites, planners look for:
- Solid, non-porous bedrock for the foundation
- Narrow valleys with wide basins upstream
- Reliable water flow from a large catchment area
- Minimal impact on rare or sensitive ecosystems
- Low population density in the reservoir area
- Reasonable construction costs relative to benefits
- Community acceptance and political support
By carefully considering these factors, planners can select dam sites that provide maximum benefits with minimum negative impacts.
Log in to track your progress and mark lessons as complete!
Login Now
Don't have an account? Sign up here.